![]() “So this year,” she said, “we were looking at it from an operational standpoint. Typically, Striffler said, in determining the annual maintenance projects, the Parks and Recreation Department looks at mechanical repairs that need to be made. This fall’s recreation center maintenance projects cost $881,466. Striffler estimates construction on the Bow Creek facility wouldn’t start until 2013.īefore that, in fall 2012, the city will open its seventh community center, Williams Farm Community Recreation Center, off Newtown Road. “We have just selected an architecture firm to do the design. “We will basically redo that recreation center,” she said. 37 reviews Claimed Gyms, Swimming Lessons/Schools, Recreation Centers Edit Open 5:00 AM - 9:00 PM Hours updated 1 month ago See hours See all 70 photos Write a review Add photo They have a lazy river, a water fort, multiple basketball hoops, a pool for free swimming, lap lanes, a spring board and a rock wall. The center, opened in October 1979, is the second-oldest recreation building, and Striffler said there are bigger changes planned for it. The only city facility to not receive an upgrade this fall is Bow Creek. “The pool shell is in pretty bad shape at this point,” Fernheimer said, adding that the new filtration system will improve water clarity. Some loose tiles on the pool’s deck area also will be replaced.ĭespite the pool’s closure, Carol Fernheimer, interim aquatic and therapeutic recreation coordinator for the city, said members are excited about the improvements. In addition to the lobby project, the pool at Seatack is getting a new filtration system and resurfacing of the pool shell, or interior of the pool. Kempsville Recreation Center will be closed Sept.?26 until Oct. Involved in all renovation assistance for Muse Hall and Deadmon Center (paint, clean, move all equipment). Great Neck patrons may soon notice new paint in the weight room, gymnasium and the halls connecting the two areas. Kempsville/ Bow Creek Recreation Centers. Kempsville rec center opening delayed almost a month, with summer. ![]() Having just one information desk reduces energy costs, Fisher said, as does the facility’s new automated sliding lobby doors. 3 things to expect at the new Kempsville Rec Center in Virginia Beach. Now there’s one desk near the entrance, where people can check in and have their membership cards scanned. Great Neck consolidated its information and service desks, which used to be located at three areas throughout the building. The Great Neck, Bayside and Princess Anne centers also will have larger aquatic office windows, making it easier for members to communicate with pool staff, Striffler said. Construction on the 87,000-square-foot facility is in the final stages, and a grand opening is set for June 8. E-Pilot Evening Edition Home Page Close Menuīleacher seating will eventually be added for parents and members to watch pool events. The Kempsville Recreation Center will reopen this summer, just in time for the kiddos to enjoy the splash zone and zero-entry pool.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |